Challenge
A major downstream operator was challenged to develop a turnaround plan that ensured:
- Scope and cost remained within budget
- The turnaround plan and its execution were both effective and efficient
- Safety and risk mitigation were considered at every stage
Solution
The operator deployed the digital twin to establish a shared foundation for engineering alignment and turnaround planning across technical teams.
Key capabilities used:
- Integrated access to work order and scheduling data
- High-fidelity 3D models and photogrammetry to provide an accurate visual context of the site
- Remote access to the asset and data 24/7
Results
- 50% reduction in physical job walks required for work order creation
- 20% time savings in planning and scoping activities
- Improved decision quality through shared, contextual access to assets across teams
Related use cases

June 26, 2026
SiteCom: Avoiding the hidden costs of inconsistent data with the GM Hub

June 19, 2026
SiteCom: Real-time gas shift analysis for understanding pressure behaviour in HPHT wells

June 12, 2026
SiteCom: Why real-time data quality monitoring is now a safety-critical function

June 3, 2026
SiteCom Link: Closing the gap between disconnected systems and real-time well operations